/ provandal

Brass Tacks · October 27, 2011

A Multi-Hop FCoE topology example

Originally posted October 27, 2011 at 01:28 PM on brasstacksblog.typepad.com/brass-tacks/2011/10/a-multi-hop-fcoe-topology-example.html

Recovered from the Internet Archive: post and comments, captured Sep 10, 2025 · archived page (PDF)

As I mentioned in the previous post, in early November we will be releasing an updated version of the FCoE TechBook that will contain a number of fixes as well as a new Multi-Hop case study.  The exact topology that will be configured in that case study is shown below.

Casestudy

The topology is intended to highlight all of the different connectivity options  available and is not intended to represent a realistic topology.  I'll provide a link to the actual case study as soon as it becomes available.

Thanks for reading!